Skip to content

For professionals · EV mobility

EV chargers (IRVE)

Installation, supervision and maintenance of one to three charging points on your business site.

  • Turnkey study and installation
  • Remote supervision
  • One team for the whole project
Your project

EV chargers (IRVE): the essentials

We install one to three electric-vehicle charging points (EVSE) on your business site, then supervise and maintain them. You have a single contact for the whole project.

Who is it for, and for what uses?

It suits craftspeople, shopkeepers, hoteliers, practices and very small businesses that want to charge their work van, or offer charging to customers and employees, on their own car park.

What it changes for you

Your installation is sized for your usage, properly connected and supervised remotely. If a charging point fails, we see it and we intervene.

Which charging power should you choose?

For an employee or visitor car park, a 7.4 kW alternating-current (AC) charging point is usually enough: a vehicle parked for several hours charges comfortably. 11 or 22 kW are justified when vehicles park for a short time or the fleet drives a lot. Direct current (DC, fast charging) targets intensive use and requires a grid study.

The power actually used is capped by the vehicle's on-board charger: a 22 kW point does not charge faster than 11 kW a vehicle whose charger is limited to 11 kW. The times below are orders of magnitude for a vehicle consuming 16 kWh per 100 km, excluding charging losses.

PowerCurrentTime for 100 kmTypical use
3.7 kWSingle-phase ACabout 4 h 20Occasional use
7.4 kWSingle-phase ACabout 2 h 10Employee car park
11 kWThree-phase ACabout 1 h 30Customers, fleets
22 kWThree-phase ACabout 45 min if the vehicle accepts itFast turnover
50 kW and aboveDCa few tens of minutesIntensive fleets

Which plug and which charging mode?

The Type 2 plug is the European standard for alternating current, and the CCS (Combo) connector is used for DC fast charging. In business settings, the reference is mode 3: a dedicated charging point that communicates with the vehicle to secure the charge.

The household socket (mode 1) is discouraged for safety reasons, and the reinforced socket with a control box (mode 2) remains a stop-gap. Mode 4 refers to DC fast charging.

How do you avoid raising the subscribed power?

Dynamic load management shares the available power between charging points according to the activity of the site and its other equipment. It most often avoids raising the subscribed power of your contract, and therefore the standing charge, and can shift charging to off-peak hours.

We check the power available on your site before choosing the equipment: it sets the number and power of the charging points.

What does the installation include?

We supply, install and commission one to three charging points, then handle the connection, remote monitoring and maintenance. If a point fails, we see it and we intervene.

We can also supply the electricity that feeds your charging points: you have a single contact for the equipment and for the contract.

Go further: read the guide

Our solution

A turnkey charging project covers three areas:

CriterionWith Eneffic
Study and installationSizing, connection and turnkey installation
SupervisionRemote monitoring of your charging points
MaintenanceServicing and maintenance throughout the life of the installation

Thomas's take, our expert

The charging point is the easy part. The real subject is the power available at your premises. I always start there, before choosing hardware.

Thomas, Energy expert

Our support

A single contact supports you at every step, from the initial analysis to long-term follow-up.

YOUR PROJECT STEP BY STEP

  1. Usage study

    We analyse your vehicles, parking and available power.

  2. Sizing and costing

    We define the hardware and power management.

  3. Installation and connection

    Our teams install and commission the charging points.

  4. Supervision and maintenance

    We track usage and intervene in case of fault.

Key takeaways

  • A single contact

    From study to maintenance, a single team.

  • Controlled power

    Load management often avoids raising your subscribed power.

  • Supervised charging points

    Faults detected and usage tracked remotely.

Let's talk about your charging project

Our advisors study your usage and available power, then size the installation and check possible funding.

Free quote · No commitment · Reply within 24 h

Reviews

They trust us

Feedback from clients supported by Eneffic, received by email and anonymised at their request.

We were looking for a clear electricity contract and someone available to answer our questions. The team took the time to explain the offer and the paperwork was simple.

Eneffic client

Business client

What we like about Eneffic is being able to reach someone who knows our file. When we have a question, we get a clear answer.

Eneffic client

Business client

We had several sites with different renewal dates. Eneffic helped us get a clearer picture and simplify how we track our electricity contracts.

Eneffic client

Multi-site client

We wanted better control of our electricity budget. The conversations helped us understand the options and choose the one that fit our business.

Eneffic client

Business client

The change of supplier went well. We were supported through the process and kept informed until the contract started.

Eneffic client

Business client

An accessible team that takes the time to explain things. For a small business like ours, it is a relief not to have to become an energy expert to understand our contract.

Eneffic client

Client, small business